Omaha Public Power District — Omaha, Nebraska
Ft. Calhoun Nuclear Generating Station
- Plant—wide Control Data Highway System Design and Implementation
- Plant Information System Replacement Design
- Unit Feedwater Control Replacement
- Foundation Field Bus System for Unit Feedwater Heater Control Replacement
- Unit Secondary Control Element Position Indication System Replacement
- Qualified Safety Parameter Display System Replacement
|
|
American Electric Power
D.C. Cook Nuclear Power Plant
- Design Document Preparation/Revision
- Reactor Protection System Digital Upgrade Engineering and Design Support
- Develop a Setpoint Methodology Design Guide
- Development of Uncertainty and Setpoint Calculations
- Engineering Studies Including MTBF/FMEA, Grounding, Temperature Profiles, etc.
- Evaluation of EMI/RFI, EQ, Seismic and Electrical Isolation Documentation
- Participation on D.C. Cook NRC Audit Term
|
|
Pacific Gas & Electric
Diablo Canyon Nuclear Power Plant
- Marked—up Procedures Impacted by Steam Generator Replacement
- Revised Uncertainty/Setpoint Calculations
- Revised Instrument Scaling Calculations
- Identified Impact of Steam Generator Replacement on I&C Documents
|
|
Florida Power & Light
St. Lucie Nuclear Power Plant
Turkey Point Nuclear Power Plant
The Following is for 2 Units at Each Plant
- Develop, Plan, and Implementation Support for Multi—Unit DCS—based Digital Replacement of all Safety and Non—safety Related Instruments, Control Systems and Plant Computer Systems
- Provided Overall Program Definition
- Developed Project Phase Planning
- Developed Various Specifications
- Provided Plant Data Network Design
- Developed Human Factors Criteria
- Provided Diversity and Defense in Depth Analysis
|

|
Constellation Energy Group—Nuclear Operations
Calvert Cliffs Nuclear Power Plant
- Developed Instrumentation and Control Systems Upgrade Strategic Plan
- Developed Setpoint Calculation Updates Relative to Heat Balance Calculations in Support of Power Up—rate
- Developed Instrument and Control Setpoint Program to Define Methodology Design Guide, Extension of Surveillance Frequency, and Approach to Address Instrument and Loop Uncertainties
- EOP and Technical Specification Action Value Project to Accumulate, Summarize and Prioritize Action Values Within These Specifications to Determine Requirements for Uncertainty Calculations
- 24 Month Surveillance Extension Project Engineering Including Determination of Instrumentation Impact, Drift Analysis Methodology, Instrument Drift Calculations, and Uncertainty/Setpoint Calculations
|
|
NRG Texas (Formerly Houston Lighting and Power) — Houston, Texas
South Texas Nuclear Power Plant (Units 1 & 2, Westinghouse PWR’s)
- Designed I&C Modification and Developed Setpoint Calculations for New Delta 94 Steam Generators
- Verification of Design Bases Safety—Related Setpoints and Development of PC—based Database to Document and Control the List of Setpoints
- Developed and Designed Integrated Plant Computer System that Includes the Main Plant Computer, Annunciator System, Bypass/Inoperable Equipment Monitoring System, and Emergency Response Facilities Display and Data Acquisition System Click here for additional information.
- Designed, Engineered, and Provided Procurement Support for Turbine—Generator Monitoring and Data Multiplexing System
- Provided Project Management and Design Engineering for Integrated Vibration Monitoring and Turbine Supervisory System
- Designed Replacement Steam Generator Tube Leak Detection (N16) System and provided Commissioning Support
- Engineered and Designed Plant Fire Detection System Replacement and Provided Installation / Testing Support
- Designed Foundation Field Bus Instrumentation System for Unit 1 and 2 Secondary Feedwater Heaters and Drains
- Meteorological tower and Instrumentation Replacement Design and Procurement Documents and Installation Supervision
- Continuation Engineering Services for Plant Instrument and Control Systems Modifications Including Vendor, Licensing and Regulatory Interface
- Various Systems Software Quality Assurance
South Texas Project – New Nuclear Power Plants (Units 3 & 4, Toshiba ABWR’s)
- Combined Operating License Application, Chapter 7 Development
- Owner’s Engineer for Design Review and Acceptance
- Support NRC’s Reviews ( ACRS Presentations, RAI’s, Developing ITAAC Resolutions, and DCD Updates)
|
|
First Energy — Nuclear Operations
Davis Besse – Nuclear Power Plant
Unit Load Demand Controls Replacement
- Approved Vendor’s Factory Acceptance Test (FAT) Procedures
- Provided FAT Support
- Developed Site Acceptance Test (SAT) Plan and Procedures
- Provided Site Support for SAT
|
 |
Nebraska Public Power District — Nuclear Operations
Cooper Nuclear Station
- Designed PLC Based Replacement for Multiplexer and Annunciator System
- Provided Annunciator System Integration (Hardware Integration and Software Configuration and HMI Development)
- Fabricated Annunciator System (15 Cabinets & 6 Operations Workstations)
- Provided Annunciator Training Simulator System Integration (Hardware Integration and Software Configuration and HMI Development)
- Fabricated Annunciator Training Simulator System (2 Cabinets & 2 Operations Workstations)
|
 |
Electric Power Research Institute (EPRI)
- Principle Investigator for the Nuclear Market & Supported the Nuclear Industry Sensor Survey
- Principle Investigator on the NMAC’s Terry Turbine Digital Controls Replacement Guidelines
- Principle Investigator on the “Gold” Circuit Card Lifecycle Management Plan
|
 |
Ameren UE — Nuclear Operations
Callaway Nuclear Station
- Provided Design for Main Control Room Computer CRT Replacement with Flat Screen Displays
- Provided Design for Plant Process Computer Replacement
- Provided Design for Digital Feedwater Control Replacement of GE GC20 with Siemens T-3000
- Provided Design for Main Steam Turbine Controls Replacement of GE Mark II with Siemens T-3000
- Provided Integration Design for an Industrial Computer Server Cabinet for Siemens Thin Client Servers
- Provided Hardware Integration and Fabricated Server Cabinet
|
 |
Tennessee Valley Authority (TVA) — Nuclear Operations
Bellefonte Nuclear Station
- Provided Review of Restart Project Budget
- Develop & Execute a Vendor Oversight Program for all I&C Vendors
- Provide Technical & Licensing Independent Reviews
- Provide Digital System Utilization Recommendations
|
 |
Wolf Creek Nuclear Operating Company
Wolf Creek Nuclear Station
- Developed Specification for Terry Turbine Controls Replacement
|
 |